• Login
    View Item 
    •   DSpace Home
    • 2-DERGİLER
    • 03) Bitlis Eren Üniversitesi Fen Bilimleri Dergisi
    • Cilt 11, Sayı 4 (2022)
    • View Item
    •   DSpace Home
    • 2-DERGİLER
    • 03) Bitlis Eren Üniversitesi Fen Bilimleri Dergisi
    • Cilt 11, Sayı 4 (2022)
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    A Comparison of Risks Assessment for the Project Phase of Solar Power Plant Installation with FMEA Pareto and AHP Methods

    Thumbnail
    View/Open
    Tam Metin/Full Text (1.041Mb)
    Date
    2022
    Author
    KESKİN ÇITIROĞLU, Hülya
    ARCA, Deniz
    CAN, Eray
    Metadata
    Show full item record
    Abstract
    As a result of the rapid depletion of fuels, high costs and environmental concerns which is in today’s conditions in energy production by traditional methods cause rapid orientation to renewable energy sources. In this context, the number of alternative researches and studies on the phenomenon of energy, which has become an indicator of the development of countries, has increased steadily. Taking measures by analysing possible failures and risks in the establishment and operation of renewable energy plants is of great importance in terms of cost control, efficiency, sustainability of production and ensuring the safety of life and property. For this reason, in this study, failures and risks occurring in the projecting stage, which is the first and important stage of the installation of solar power plants (SPP), which are among the sustainable and renewable energy sources that have become an important part of our lives are analysed using Failure Mode Effect Analysis (FMEA). In the FMEA analysis, the precautions that can be taken against the mistakes and risks that may be encountered regarding the researched subject were investigated. In addition, the opinions of experts on this subject expressed in the literature and researches were also taken into consideration. Then, with the Pareto analysis and Analytical Hierarchy Process (AHP) method systematic, the order of importance of the risks was determined and the similarities between them were tried to be determined
    URI
    http://dspace.beu.edu.tr:8080/xmlui/handle/123456789/14743
    Collections
    • Cilt 11, Sayı 4 (2022) [23]





    Creative Commons License
    DSpace@BEU by Bitlis Eren University Institutional Repository is licensed under a Creative Commons Attribution-NonCommercial-NoDerivs 4.0 Unported License..

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     




    | Yönerge | Rehber | İletişim |

    sherpa/romeo

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsBy TypeThis CollectionBy Issue DateAuthorsTitlesSubjectsBy Type

    My Account

    LoginRegister

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV